Barita Eco Lestari
Barita Eco Lestari industrial facility
PT BARITA ECO LESTARI

Because Waste Should Never Be The End of a Material's Story.

We are building an industrial waste management and material recovery system in Galang, Batam — designed to keep materials in circulation, recover value, and minimize what becomes waste.

2026

Established

7.8 Ha

Development Area

Galang, Batam

Industrial-Estate Location

Company Snapshot

Built from the Ground Up for Material Recovery.

PT Barita Eco Lestari was established in 2026 to develop practical waste-management and recovery pathways for industrial materials. Our development site is located within Wiraraja GESIP Galang, where the company is preparing its first construction-material recovery and production capability.

PURPOSE

Because waste should never be the end of a material's story.

VISION

To make every waste material valuable again.

MISSION

To keep materials in circulation and valuable for as long as possible, while minimizing what becomes waste.

What We Are Building

A Phased Path from Waste Handling to Material Recovery.

Barita is not trying to build every processing capability at once. We start with waste streams that are technically understood, available in meaningful volume, and capable of returning to productive use. As tenant waste streams become clear, new processes and technologies will be added only where the business case is proven.

Workers sorting recovered materials on a conveyor line

01

Under Development

Industrial & Construction-Material Recovery

Current development focus.

02

Planned

Expanded Inorganic Recovery

Plastics and other recoverable materials, as volume justifies.

03

Planned

Organic Waste Management

Dedicated organic-waste pathway.

04

Aspiration

Integrated Waste Ecosystem

Long-term direction, not a current capability.

From Waste to Value

A Controlled Pathway from Source to Recovery.

Our role is not simply to move waste from one place to another. Each material stream should have a clear, controlled pathway — from identification at source to its next responsible use or destination.

Workers processing recovered material
Material recovery facility
Sorted recovered material
Recovered material

01

Identify

02

Segregate

03

Record

04

Collect

05

Verify

06

Store

07

Assess

08

Process

09

Validate

10

Return to Use

11

Report

Phase-One Development

Building Capability Before Demand Fully Arrives.

– Under Development

While the industrial estate develops and tenant waste streams mature, Barita is sourcing selected industrial residues from outside the estate to build early processing capability, product-development capability and quality controls. Initial R&D focuses on fly-ash-based construction materials using selected industrial residues where technically and legally appropriate.

Why Barita

Built for Recovery, Not Merely Disposal.

Barita Eco Lestari workers collaborating
  1. 01 We begin with the material problem, not with the machine.
  2. 02 We build capability in phases instead of claiming every process from day one.
  3. 03 We design for controlled handling, traceability, and measurable recovery.
  4. 04 We validate products before making performance claims.
  5. 05 We intend to grow with the industrial estate, not ahead of the evidence.
• Current - Site Secured

A 7.8-Hectare Site Designed to Grow by Waste Stream.

The long-term facility concept separates B3, inorganic and organic streams while sharing core receiving, control, laboratory and support infrastructure. Initial development is planned around construction-material recovery and production.

Explore Technology & Facility
Barita Eco Lestari industrial site

Have a Waste Stream You Need to Manage?

Tell us what material you generate, where it comes from, and approximately how much. We can begin with the material before discussing the process.

Discuss Your Waste Stream